Rail shuttle

Pub_Aerotrain_A

SERVICE: Express rail shuttle between the Montréal–Trudeau terminal and Central Station, in Montréal’s downtown core

USERS: Montréal travellers; businesspeople, conventioneers and tourists; airport employees

TRANSIT TIME: Approximately 20 minutes, rain or shine

FREQUENCY: Departures every 20 minutes, in both directions

SCHEDULE: 4 a.m. to midnight, 7 days a week

COMPETITIVE PRICES

ROLLING STOCK: Self-propelled, energy-efficient

CARS: Designed for travellers: Comfortable, with baggage compartments, wide doors, screens with flight information, etc.

PASSENGER TRAFFIC: about 2.3 million/year at the start of operations, rising to 3.5 million and more than 3.8 million by 2020

DURATION OF WORK: 24–36 months

STARTUP: Possibly before 2016

PROJECT LEADER: Aéroports de Montréal

OPERATOR: ADM with private investors

PARTNERS: CN and Homburg (owner of Central Station)

INVESTMENT – INFRASTRUCTURES: Private investors, Government of Québec, Government of Canada
($200 million each)

INVESTMENT – OPERATION: ADM and private investors ($50 million) - Profitable, unsubsidized operation

BENEFITS:

  • Transit time to airport guaranteed at all times
  • Enhancement of Montréal’s attractiveness as a place to do business and as a convention and tourism destination
  • More than 1.7 million vehicles/year removed from the roads
  • Reduced road traffic and GHG emissions
  • Elimination of two level crossings in Southwest Montréal
  • Potential for use of tracks by other passenger rail services, including express commuter trains between Dorval Station and downtown and VIA Rail
  • Improved fluidity of freight train traffic
Document